Waste Factor Material
Calculator
Results
- Order quantity (units)
- 110
- Extra units ordered
- 10
Construction results
| Order quantity (units) | 110 |
| Extra units ordered | 10 |
formula-map diagram
- Order quantity (units)
- 110
- Extra units ordered
- 10
Formula breakdown
Formula
order = quantity needed × (1 + waste ÷ 100)= 110
Note
Simplified model: results are quantity estimates only. They ignore openings, overlaps, cuts, site conditions and local building codes. Structural figures are not a substitute for a design by a qualified engineer.
Example: with the default inputs, calculator.construction.order_quantity_units is 110.00000000000001.
More in Construction and trades
See all →Frequently asked questions
How do I calculate how much material to order including waste?+
Multiply the exact quantity you need by one plus the waste percentage divided by 100. For 100 units at 10% waste, the order quantity is 110.
What does the extra units result mean?+
It is the order quantity minus the exact quantity needed. It shows how many units of waste allowance you are adding on top.
What waste percentage should I enter?+
The calculator defaults to 10%, but it does not decide this for you. Enter the allowance that fits your material and your cutting or breakage experience.
Does this work for any material or unit?+
Yes. It is a plain percentage markup on a quantity, so it works for any unit, such as sheets, metres, kilograms or pieces. The result is in the same unit you entered.
Does the result round up to whole units?+
No. The order quantity is shown as calculated, not rounded. If the material is sold in whole pieces, round up yourself.