Excavation Volume
Calculator
Results
- In-place volume (m³)
- 12
- Loose (bulked) volume (m³)
- 15
- Volume (cubic yards)
- 19.619259
Construction results
| In-place volume (m³) | 12 |
| Loose (bulked) volume (m³) | 15 |
| Volume (cubic yards) | 19.619259 |
formula-map diagram
- In-place volume (m³)
- 12
- Loose (bulked) volume (m³)
- 15
- Volume (cubic yards)
- 19.619259
Formula breakdown
Formula
V = L × W × D, then V × (1 + bulking ÷ 100)= 12
Note
Simplified model: results are quantity estimates only. They ignore openings, overlaps, cuts, site conditions and local building codes. Structural figures are not a substitute for a design by a qualified engineer.
More in Construction and trades
See all →Frequently asked questions
How is excavation volume calculated for a basic dig?+
Volume equals the area to be excavated multiplied by the average depth — length × width × depth for a rectangular footing or basement, given in cubic yards or cubic metres depending on convention. More complex shapes (sloped sides, trenches) need adjusted formulas.
Why does the calculator ask about soil swell or bulking factor?+
Soil expands when it's dug up and loosened — undisturbed (bank) soil becomes bulkier once excavated, typically by 15-30% depending on soil type, so the volume of spoil to be hauled away is larger than the in-ground volume that was removed.
What's the difference between bank volume and loose volume?+
Bank volume is the volume of undisturbed soil in place before digging (what the excavation calculation directly measures), while loose volume is the larger volume that same soil occupies after excavation due to the air gaps introduced by loosening — haul truck capacity should be planned around loose volume, not bank volume.
Does the calculator account for sloped excavation sides (battering) required for safety?+
A basic rectangular calculation doesn't include battered (angled) sides, which are often required by code for deeper excavations to prevent collapse — for a sloped-side trench or pit, the volume calculation needs to average the wider top opening with the narrower bottom, increasing the total volume beyond a simple rectangular prism estimate.
Why is it useful to know excavation volume in both bank and loose terms before hiring equipment?+
Bank volume tells you how much material physically needs to be removed from the ground (informing dig time and equipment sizing), while loose volume tells you how many truckloads or how much disposal capacity you'll need, since haul trucks and dump fees are based on the bulked-up volume, not the original in-ground measurement.