Drainage Slope Fall
Calculator

Inputs

Required fall (m)
0.2

Results

Required fall (m)
0.2
Required fall (mm)
200

Construction results

Required fall (m)0.2
Required fall (mm)200

formula-map diagram

Required fall (m)
0.2
Required fall (mm)
200

Formula breakdown

Formula

fall = length × (slope ÷ 100)

= 0.2

Note

Simplified model: results are quantity estimates only. They ignore openings, overlaps, cuts, site conditions and local building codes. Structural figures are not a substitute for a design by a qualified engineer.

Example: with the default inputs, calculator.construction.required_fall_m is 0.2.

More in Construction and trades

See all →

Frequently asked questions

How do I calculate the fall for a drainage slope?+

Enter the length to drain in metres and the target slope in percent. The calculator multiplies the length by the slope to give the required fall in metres and millimetres.

What formula does it use?+

fall = length × (slope ÷ 100). For example, 10 m at 2 % gives 0.2 m, which is 200 mm.

Is the slope a percentage or a ratio?+

It is a percentage. A 2 % slope means 2 units of fall for every 100 units of length.

Does it tell me which slope I need?+

No. You choose the target slope; the calculator only converts it to a fall. Required slopes depend on the surface, material and local rules, so check them yourself.

Does the length mean horizontal distance?+

The calculator simply multiplies the length you enter by the slope, with no trigonometric correction. Measure the length along the run you want to drain and use the same slope definition throughout.